CURRENT PROJECTS
WATER INFRASTRUCTURE REPLACEMENT - WC 1399
This project includes:
- Installation of Zinc Coated DIP and Fittings with V-Bio Polyethylene Encasement
- Installation of Resilient Wedge Gate Valve and Roadway Box
GRANGE ELEMENTARY PARKING LOT
This project includes:
- Installation of Street Lights
- Concrete Foundations
- Wiring and grounding
- Trenched conduit
- Metered pedestals and permits
- Splice boxes
- Handholes
- Jack and boring under pavement
SMALL WATER MAIN REPLACEMENT - WC 1418
This project includes:
- Installation of Zinc Coated DIP and Fittings with V-Bio Polyethylene Encasement
- Installation of Resilient Wedge Gate Valve and Roadway Box

NEW TOWNHOME COMMUNITY - STRATHMORE
This project includes:
- Installation of streetlights
- Installation of bollards
- Concrete Foundations
- Wiring and grounding
- Trenched conduit
- Metered pedestals and permits
- Layout and surveying

SEAMON AVENUE - SDC 7788
This project includes:
- Installation of manholes
- Concrete
- Stake Outs
- Excavation
PHASE II STREET IMPROVEMENTS
This project includes:
- Trenched conduits
- Street lighting
- Installation of junction boxes
BURTONSVILLE ACCESS ROAD
This project includes:
- Installation of light poles
- Concrete Foundations
- Wiring and grounding
- Trenched conduit
- Metered pedestals and permits
- Splice boxes

DRAINAGE REPAIRS - SDC 7803
This project includes:
- Furnishing labor and utility trucks

POTOMAC WOODS
This project includes:
- Trenched conduits
- Street lighting
- Concrete foundations